Brownline Cooler
Building
Mount Vernon Washington
A new 30,000 square foot pre-engineered steel building with
insulated panels. The building is a cold storage and freezer
building for Brownline Trucking Inc. The building was
designed and constructed with longevity and durable of
construction in mind. The planing of the interior racking
system was designed around fork lift operation and ease of
packing and delivering. Construction completed September
2003, $750,000. |
| |
|
|
| |
|
Janicki
Machine Design Corporate Headquarters
Sedro-Woolley, Washington
10,000 square foot building, including space planning and integration
of manufacturing spaces. Construction completed January 1997, value
$875,000. |
| |
|
|
| |
|
Twin Bridge Marina
Anacortes, Washington
58,000 square foot boat storage facility, and 14,000 square foot
retail sales building. Construction completed May 2001, value $1.75
million. |
| |
|
|
| |
|
Mobile Merchandisers
Mount Vernon, Washington
20,000 SF Pre-engineered steel building warehouse distribution center
and corporate offices for a retail display shelving manufacturer/distributor.
Construction completed December 2001, value $1.3 million. |
| |
|
|
| |
|
San Juan Composites
Anacortes, Washington
30,00 square foot pre-engineered metal building for fiberglass boat
manufacturer. Construction completed April 2001, value $575,000. |
| |
|
|
|
|
Smith Brothers Farms
Mount Vernon, Washington
A new 18,000 square foot building for an agricultural business to
store potatoes. The building is a hybrid construction combining both
concrete tilt and pre-engineered metal. The building has a complex
refrigeration system to cool potatoes. Construction was completed
October 2002, value $750,000. |
| |
|
|
|
|
Morrison Farms
Mount Vernon, Washington
A new 8,000 square foot pre-engineered steel building for an agricultural
business to store and maintain equipment. The entire building has
an infloor radiant heating system. Construction completed November
2002, value $350,000. |
 |
|